Need Help? Call us at (281) 541-2807 Visit our Facebook Page Follow us on Twitter Subscribe to our RSS Feeds

What You Need to Know About Section 404 Permits

presented by Lorman Education Services
View the Lorman Education Services Profile and Course Listings

Summary

What You Need to Know About Section 404 Permits

Workshop Description/Agenda

Benefits
Are you prepared for additional requirements that can be triggered during the Section 404 Permit process?The regulation of wetlands and waterbodies through Section 404 of the Clean Water Act has been well documented. However, what is often unaccounted for are the additional requirements that can be triggered during the Section 404 Permitting process. These oftentimes unforeseen requirements can add costs andor even delay a project significantly. Therefore, while it is important to understand the basis of the Section 404 regulatory review process, it is equally as important to learn about and understand the ancillary reviews and requirements that can ultimately lead to a project's success or failure. This topic is intended to better prepare you for the basic Section 404 regulatory review process administered by the U.S. Army Corps of Engineers and to guide you through some potential key issues that can occur during that process. At the completion of this content, you will be able to better predict major obstacles and potentially costly issues associated with Section 404 of the Clean Water Act.

Agenda
U.S. Army Corps of Engineers – Section 404 Permit Authority • Clean Water and 404 (B)(1) Guidelines • National Environmental Policy Act • EPA and Corps Roles • Other Regulatory Authorities Jurisdiction and Permitted Activities • Waters of the U.S. (33 CFR 328.3) • Placement of Dredged or Fill Material • Exemptions How to Hire a Consultant • Regulatory Resources • Approved Wetland Consultant List • What to Look for When Selecting a Consultant Types of Permits and Associated Timeframes • Standard or Individual Permits • Regional General Permits • Nationwide Permit • Non-Permit Approvals What Goes in the 404 Permit Application • Existing Condition Reports and Construction Plans • Project Purpose and Need • Alternative Analysis • Mitigation Plan • Financial Assurances Unforeseen Obstacles • Ancillary Regulated Resources • Associated Timeframes and Costs Post Permitting • Permit Conditions • Construction Completion Notice Liability Issues

Faculty
Scott Billings with SCI Engineering, Inc. and Rick Gundlach, PWS with SCI Engineering, Inc.

Credits
AIA ,ENG ,Additional credit may be available upon request.

Who Should Attend

This live audio conference is designed for engineers, project managers, environmental professionals, contractors, subcontractors, public works and utilities directors, government officials, presidents, vice presidents, developers, real estate professional

Additional Information

Training Provider: Lorman Education Services

Course Topics: Law Training > Land Use

Training Course Summary: What You Need to Know About Section 404 Permits


Find Similar Training Find Similar Training
Email This Training's Information Email This Page

On-Demand Webinar Details

Recorded on 12/19/2018